SUPPLYING CABLE FOR NATIONAL ELECTRICITY POWER SUPPLY PROJECT FOR NHON CHAU ISLAND COMMUNE (BINH DINH)

  • Name of project: SUPPLYING CABLE FOR NATIONAL ELECTRICITY POWER SUPPLY PROJECT FOR NHON CHAU ISLAND COMMUNE (BINH DINH)
  • Place: Binh Dinh
  • Year: 2020
  • Products provided: Power cable
PROJECT INFORMATION

On the afternoon of April 17, 2020, the Project Steering Committee for the national grid supply by submarine cable to Nhon Chau island commune, Binh Dinh province by online form at 3 bridge points: EVNCPC Head Office, Binh Dinh PC and PC Phu Yen chaired by EVNCPC Deputy General Director Le Nam Hai. Attending at Binh Dinh PC Bridge point were Mr. Ngo Hoang Nam – Chairman of Quy Nhon City People’s Committee, Mr. Ngo Van General – Director of Binh Dinh Department of Industry and Trade and Mr. Huynh Ngoc Viet – Director of Binh Dinh PC.

Project of supplying electricity by submarine cable to Nhon Chau island (Binh Dinh) invested by EVNCPC includes 4 items: 22kV output compartment at Song Cau 110kV transformer station and 22kV on land line in TX area. Song Cau; to build a new 22kV submarine cable line single-stranded across the sea, more than 10km in length, connecting from the 22kV Hoa An cutting station (Xuan Hoa commune, Song Cau town) to Nhon Chau island commune; building Nhon Chau 22kV cutting station, 2 22 / 0.4kV transformer stations with a total capacity of 650kVA; building telecommunication systems and information cables … The total cost of implementing the project is nearly 351.5 billion dong from the non-refundable ODA funded by the EU.

The project has been implemented since April 2020 and strives to complete energizing by September 2020,